Kansas Department Of Transportation
Home MenuU.S. 24 Bridges over Goodyear Road
Project Description
This priority bridge replacement project is in the early design phase and includes replacement of the U.S. 24 Bridges over Goodyear Road in north Topeka in Shawnee County. Specifically, this project is the replacement of bridge #076 (westbound) and bridge #077 (eastbound), which are located 1.67 miles east of the U.S. 24 / U.S. 75 junction.
Replacement of the existing bridges is necessary due to the end of their service life. Additional benefits of the project include reducing future maintenance needs and enhancing safety and connectivity.
This project is part of the KDOT Priority Bridge Replacement Program, and it is anticipated to be under construction in the fall of 2025.
Project Location
Project Details
Project Name | U.S. 24 Bridges over Goodyear Road |
Project Number | KA-6481-01 |
Location | U.S. 24 Bridges over Goodyear Road in north Topeka in Shawnee County, and specifically, bridge #076 (westbound) and bridge #077 (eastbound), which are located 1.67 miles east of the U.S. 24 / U.S. 75 junction. |
Scope | Bridges replacement project to replace two bridges along U.S. 24 over Goodyear Road. Current Preliminary Design Phase involves roadway design, bridge design, traffic analysis, traffic modeling, a Transportation Management Plan, maintenance of traffic staging and phases, and community engagement. Future construction phase will include the removal of the two U.S. 24 Bridges over Goodyear Road and construction of replacement bridges. |
Approximate Length | N/A |
Project Timeline | Preliminary Design |
Construction Cost | 5.2 million |
Related Projects
Public Meetings
Events
-
U.S. 24 and I-70 Projects Open House
11/13/2024 5:00 PM - 7:00 PM