U.S. 54 Bridge over Walnut River

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Project Description

The project involves replacing the U.S. 54 bridge over the Walnut River on the eastern edge of El Dorado. The bridge is located about 0.55 miles east of the U.S. 54 and U.S. 77 junction. The replacement design must consider the BNSF railroad overpass that crosses U.S. 54. 

KDOT has started a Discovery Phase Project to explore various alternatives in collaboration with the City of El Dorado, Butler County, and BNSF. The new bridge lanes will be built to the south of the existing lanes, allowing the current section to remain open during construction. 

The goal is to replace the bridge with a sustainable design that meets the functional and structural needs of KDOT, Butler County, El Dorado, and the surrounding region. 

Project Area Map

U.S. 54 Bridge Project Area Map

Project Location

 U.S. 54 Bridge Project Location Map

Project Details

Project Name U.S. 54 bridge (025) over the Walnut River 
Project Number KA-5767-01 
Location Approximately 0.55 miles east of the north junction of U.S. 54 and U.S. 77 
Scope Replacement of the U.S. 54 bridge (025) over the Walnut River, on the eastern edge of El Dorado 
Approximate Length 0.71 Miles 
Project Timeline Finished discovery phase August 2023 
Construction Cost $7.8 million 

Public Meetings

Events

Project Materials

Documents

Project Contacts

StaffTitlePhoneEmail
Gosnell, NickDistrict 5 Public Information Officer(620) 860-7389