U.S. 50/Meridian Road Interchange Improvements and Bridge Replacement

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Project Description

This interchange improvements and bridge replacement project is in the preliminary design phase and includes replacement of the U.S. 50 bridge over Meridian Road and the BNSF Railway southwest of Newton in Harvey County. Replacement of the existing bridge is necessary, due to nearing the end of its useful design life. Additional benefits include reducing future maintenance and enhancing safety. This project was identified as a top regional priority during Local Consult community meetings in the fall of 2023. As a result, it has been selected for the IKE development pipeline. The project may be selected for the construction pipeline based on program funding and other needs throughout the state. 

Project Location

U.S. 50/Meridian Road Interchange Improvements Project Map

Project Details

Project Name U.S. 50/Meridian Road Interchange Improvements and Bridge Replacement southwest of Newton 
Project Number KA-6828-01
Location 1.96 miles west of the U.S. 50 and K-15 west junction in Newton 
Scope Interchange Improvements and Bridge Replacement 
Approximate Length 1.5 miles
Project Timeline Initial concept study began in 2023. Pending funding, possible construction to begin in 2027-2028  
Construction Cost Approximately $30 million 

Public Meetings

Events

Project Materials

Documents

Project Contacts

StaffTitlePhoneEmail
Koopmann, ScottArea Engineer(316) 251-6575
Gosnell, NickDistrict 5 Public Information Officer(620) 663-3361